A product may only need a few hundred moulded parts at launch, but demand can push that into the thousands very quickly.

The aim is to scale without replacing your whole manufacturing strategy. Moving through 3D printing, pre-production tooling and full production tooling, in that order, lets you prove the design and the process at each stage before you spend more.

Read on as we outline how BEC can help your manufacturing scale with your business goals.

Stage 1: 3D Printing to Test and Iterate the Design

At the earliest stage of a new product, the priority is proving the concept, and that usually means iteration.

3D printing is the quickest and most cost-effective way to do this. At BEC, our in-house 3D printing takes a design from CAD to a physical part without any tooling. We print in a range of materials, including ABS, PLA, PET, nylon and polypropylene, as well as recycled and flexible filaments. You can check form, fit and function, handle the part, test how it assembles with other components and gather feedback from stakeholders or end users.

Because each print costs little, changes are easy. If a wall needs thickening, a clip isn’t engaging or the ergonomics aren’t right, the CAD can be updated and a new part printed straight away. You can go through several versions in the time a single tool would take to make.

If you’re starting from an existing part with no CAD data, our 3D scanning can capture it and turn it into an accurate CAD model to work from.

Iterating at this stage means problems are found and fixed while changes are still quick and cheap, long before any steel is cut.

Stage 2: Pre-Production Tooling to Test Moulded Parts

Once the design has settled, the next step is to see how it performs as a real injection moulded part. A printed prototype can only tell you so much. Material behaviour, shrinkage, surface finish and how the part fills in a mould only show up once it’s moulded in the intended production material.

This is where pre-production tooling comes in. Unlike many rapid tooling options, BEC’s rapid tools are made from the same P20 tool steel we use for all our moulds, so they’re strong and durable and the parts they produce are representative of production. They’re kept deliberately simple: single-cavity tools without unnecessary complexity can be built quickly and at lower cost, so parts reach you sooner.

The result is a fast route to moulded parts you can use to:

  • validate the design in its real operating environment
  • carry out testing, certification or customer trials
  • confirm material choice and manufacturability
  • make any final refinements before committing to full production tooling

If changes are needed, they’re made on a simpler, lower-cost tool rather than a multi-cavity production mould. And because they’re built in tool steel, pre-production tools can be adapted for production.

Stage 3: Full Production Tooling for Volume

Once the design is proven and demand is established, it’s time to invest in full production tooling. These are the moulds used for volume injection moulding UK production, built to run consistently at high volume, cycle after cycle, often for many years.

A production tool is engineered around the expected output. Multiple cavities, optimised cycle times and minimal manual intervention all help drive down the cost per part while keeping quality consistent. The upfront investment is higher, but because the design has already been proven through the earlier stages, you go into it with confidence.

At BEC, we design and cut our production tools in-house, giving us full control over quality, timeline and any modifications needed as the product evolves.

When to Move Between Stages

In short:

  1. 3D printing suits the concept phase, when the design is still changing and fast, low-cost iteration matters most.
  2. Pre-production tooling makes sense once the design is largely fixed and you need real moulded parts, quickly, to test and validate.
  3. Full production tooling is the right choice when the design is proven and volumes justify the investment.

There isn’t a fixed point at which to move on, because it depends on part complexity, target margin and how long the product is expected to run. The framework holds across most projects we support, though.

Scale Your Manufacturing With BEC

Growth changes what manufacturing has to deliver. A process that works well for a few hundred parts can become inefficient once orders climb, lead times tighten and consistency matters at a much larger scale.

BEC supports that transition from its injection moulding facility in New Milton, Hampshire, helping customers move from first prototype to full-volume production without changing supplier along the way.

Whether you’re refining a concept, testing moulded parts or scaling to volume, get in touch. We’ll advise on the right approach for where you are now and where you’re planning to be.